Industry News

Bonding process.

Update:21 Jun 2018
Summary:

The first step is to open a ventilation system and open […]

The first step is to open a ventilation system and open windows and doors on the construction site to ensure good ventilation on the site.

Step 2: Before the construction, check the function of the spray gun and eliminate the water in the air pressure pipe.
The third step: the surface of the material is clean and free of grease, dust or other impurities;
Step 4: Spray the nozzle evenly against the surface of the material;
Step 5: After evenly spraying, put it in 1- 5 minutes to bond (or glue not to touch);
Step 6: Appropriate pressurization during bonding will result in better adhesion.

Linear type: The nozzle should be at an angle of 45 degrees with the surface of the material; the nozzle should be within 0.5 meters from the surface of the material; the air pressure of the spray gun should be adjusted to the normal requirement of 6-8 kg.
Fan: The nozzle should be perpendicular to the surface of the material, and a uniform fan-shaped spray of glue should be sprayed. The fan angle is about 45 degrees.
Laminated Glue